WHEN THE LAUNCH SCHEDULE CANβT WAIT
28 September 2026 at 20:49
When the Launch Schedule Canβt Wait
How TransTech Energy modified a 30,000-gallon vertical water deluge tank for an aerospace launch facility on an accelerated timeline.
In aerospace, having equipment arrive early can be a very good problem to have.
A customer needed a 30,000-gallon vertical carbon steel tank for a launch pad water deluge system, and they needed it fast. Rather than starting with a new vessel and a traditional fabrication schedule, TransTech Energy looked to its existing tank inventory.